Wednesday, August 11, 2010

Aug 6: Footer is Down!


Photo from Todd showing the 3x3 x1/4" tube steel posts, with 12"x12"x1/2" steel base plates that have been welded onto the posts.  The plates are bolted in-place 12" into the bedrock at the corners of the Dining Room over a dry-pack concrete mix, which will be embedded in the footing. 


Dining Room tube steel posts in place, braced, and ready for the footing to be poured.


On a job site visit on Aug 3, I inspected the corners of the Dining Room, which shows the exposed bedrock at one corner.


Todd sent me a text message with the last photo of the day, which said, "Footer is down."  



What's that?  You haven't seen any wildlife yet? Well, if you haven't seen any, you can rest assured that it sees you.








No comments:

Post a Comment