Saturday, August 14, 2010

Aug 12: Stem Wall Goes UP



Stem wall formwork positioned around Dining Room posts.



View looking NW from Guest Bedroom wing.





8 PVC sleeves shown in-place to penetrate an interior stem wall to allow 1/2" dia. PEX tubing to pass through, which will deliver solar heat to a proposed high mass sand storage zone located directly beneath the slab.


View of proposed Dining Room looking NW.


A segmented foundation follows a curve along the east side of the Guest Bedroom wing. 


Formwork jogs to create a wider stem wall to support a double width concrete block wall with insulation in between, for the corner of the Living Room behind the wood stove. 


View of Mt. Jefferson from the Living Room.



2 comments: