On Tuesday, when Terry was prepared to declare the slab as being finished, it had received five coats of sealer from his airless sprayer. 


Needless to say, we are quite happy with Terry's work.  We are pleasantly surprised at the depth and variation he was able to achieve with the stain, as shown in the photos.  

Hail fell in the morning and gathered into beads of water on the slab, which was already charged with enough passive solar heat to melt the ice crystals.



In the meantime above, Brad, our mason, continues to work on the dry-stacked concrete block wall surrounded by a drop-cloth to protect the newly finished floor.