March 7-8: Roof & Walls Weatherized


With the soffit and parapet wall installed and painted, the walls are covered with building paper in preparation for window flashing and siding, above and below.


Standing seam metal roof and window flashing are installed, shown below.



Below, what looks like it could be the surface of the moon is actually a close-up view of damage to the membrane roof due to freezing that occurred during the curing process.  Fortunately, the damage was limited to a small area on the upper roof, which will be repaired in a few months after weather conditions improve.


An uncured layer of membrane below a surface skin that has been peeled back, shown in the photo below.