Roundup Ranch
Friday, September 10, 2010
Sept 10: Plumbing Excavated
The proposed plumbing beneath the slab is placed in a trench that must be carefully excavated by hand to avoid damaging the insulation and PEX tubing.
A jumble of PVC pipe fittings await assembly.
Today the trench for the main waste line was completed.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment