Monday, November 28, 2011

Oct 27- Nov 27: More Finish


Carpenter, Steve Torkelson, applies the finished wood surfaces to two unique walls, which
 feature exterior and interior barn wood, above and below.    








Below, the tile setter's assistant, Sean, prepares mortar in the moonshine to stay on schedule for the Master Bathroom floor.



Below, tile setter, Tim Giles, adjusts the slope of mortar bed on the floor of the curbless shower to achieve sufficient drainage for the Master Bathroom.


Below, concrete pavers are installed by Gary, of Hi-Style Paving, who is assisted by crew member and daughter, Toneshia, to create the Front Entrance Walkway and other adjacent connecting walkways. 



Todd and Billy are shown in the process of installing the hemlock ceiling boards,  below.